Institute for Transportation and Development Policy
Promoting sustainable and equitable transportation worldwide
中文
Photo
Article
Who We Are
ITDP China
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
0ther Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us
BRT Database
>
Cities List
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Bunous Aires
Cali
Cape Town
Changde
Changzhou
Chengdu
Curitiba
Dalian
Fuzhou
Guangzhou
Guayaquil
Guiyang
Hangzhou
Hefei
Islamabad
Istanbul
Jakarta
Jinan
Johannesburg
Kuala Lumpur
Lanzhou
Leon
Lianyungang
Lima
Los Angeles
Mexico City
Nagoya
Nanning
Nantes
Paris
Pune
Quito
Seoul
Shaoxing
Urumqi
Utrecht
Wenzhou
Wuhan
Xiamen
Yancheng
Yichang
Yinchuan
Yongzhou
Zaozhuang
Zhengzhou
Zhongshan
Zhoushan
>
贵阳
:
[Updated Time(
2018-05-08
)]
BRT Basics:
Pre-board fare collection and fare verification:
Signal priority or grade separation at intersections:
Level boarding and alighting:
Year system commenced:
2017
[28-Dec-16 trial, officially open in 13-Feb-17]
System name:
Guiyang BRT
Location of busway lanes:
Centre of roadway
Total length of dedicated busway:
29.3 km
Number of BRT terminals:
3
Operation and Service:
Network of routes and corridors:
Buses operating both in & out of BRT corridors:
Most bus passengers in BRT corridors carried by BRT buses:
More than one BRT bus operator:
Throughput >10,000 passengers/hr (one direction):
Throughput >20,000 passengers/hr (one direction):
Competitively bid operating contracts:
Payment per bus-kilometre rather than per passenger:
No operational subsidy from government:
System control centre:
BRT authority plans and controls the system:
Routes operating both inside & outside BRT roads:
11
[B3, B4, B247, B259, B224, B267, B268, B236, B242, B258, B292]
Routes operating only in busway corridors:
2
[B1, B2]
Fare type (flat fare or distance-based):
flat fare
[free transfer within 2 hours]
Median cash fare:
2 yuan
Median smart card fare:
1.8 yuan
Number of corridors:
1
Type of fare collection / verification technology:
Card/token
BRT bus operator(s):
Guiyang Public Traffic Company
Operating hours:
6:30am-10:00pm
System passenger-trips per day:
34,000
[https://baike.baidu.com/item/贵阳BRT/19777874]
Stations:
>1 substop at >75% of stations (requires overtaking):
>1 stop position at stopping area at >75% of stations:
Sliding doors in BRT stations:
Full weather protection on most station platforms:
Full weather protection on all station platforms:
Real-time CCTV surveillance at all stations:
Number of BRT stations:
25
[24 in the 1.5 ring road]
Location of bus doorways:
left side
Average distance between stations:
1.17 km
DOWNLOAD NETWORK
BRT PHOTOS
Infrastructure:
Enhanced station (more than just a bus shelter):
Overtaking lanes at more than 75% of stations:
Stations away from intersections:
Low-emission vehicle technology (≥Euro III):
Automated fare collection and fare verification:
Number of BRT depots:
2
[https://mp.weixin.qq.com/s?src=3×tamp=1526003875&ver=1&signature=6-PIAYL7Fh7lufEQgWZC-2SjfqqeIc*yB-z2uLK-grPcCgMf*AgvloHM8ZGWPLmDYDoJGOsP7Cj-qtawkIOPEL4H*jxiLwlXCq*dj*9A*xkMm9BgYUiuhajVY0TMZYQ2s4dRaavR6inf4buVi8fW0pVMeXmiStBBPLCChxUxi6w=]
Stations with functioning passing lanes:
0
Fare system vendor:
Joydata
Sliding door system vendor:
Jiangsu FuHong Transportation equipment Co.,Ltd.
Surveillance system vendor:
Qingdao Hisense Network Technology Co., Ltd
Communications:
Real-time next bus information displays:
Distinctive BRT buses:
Distinctive BRT stations:
Distinctive marketing identity for system:
High-quality passenger information at stations:
Access and Integration:
Bike sharing in vicinity of BRT stations:
Bicycle parking at BRT stations:
Segregated bike lanes along main corridor(s):
BRT Vehicle:
Fleet of special BRT buses:
132
[https://weibo.com/ttarticle/p/show?id=2309404145728950824215]
12m BRT bus cost:
0.5 m
18m BRT bus cost:
1.2 m
Number of doors in BRT buses:
3 for 18m bus on the left side
BRT vehicle length:
18m, 12m
No. of seats in 12m BRT buses:
17
No. of seats in 18m BRT buses:
38
BRT vehicle fuel:
CNG
BRT bus manufacturer:
Foton, Chery & Wanda
Others:
No
Yes
Partial
Who We Are
ITDP-CHINA
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
Other Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us