Institute for Transportation and Development Policy
Promoting sustainable and equitable transportation worldwide
中文
Photo
Article
Who We Are
ITDP China
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
0ther Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us
BRT Database
>
Cities List
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Bunous Aires
Cali
Cape Town
Changde
Changzhou
Chengdu
Curitiba
Dalian
Fuzhou
Guangzhou
Guayaquil
Guiyang
Hangzhou
Hefei
Islamabad
Istanbul
Jakarta
Jinan
Johannesburg
Kuala Lumpur
Lanzhou
Leon
Lianyungang
Lima
Los Angeles
Mexico City
Nagoya
Nanning
Nantes
Paris
Pune
Quito
Seoul
Shaoxing
Urumqi
Utrecht
Wenzhou
Wuhan
Xiamen
Yancheng
Yichang
Yinchuan
Yongzhou
Zaozhuang
Zhengzhou
Zhongshan
Zhoushan
>
Shaoxing
:
[Updated Time(
2013-11-05
)]
BRT Basics:
Segregated busways or bus-only roadways:
Pre-board fare collection and fare verification:
Level boarding and alighting:
Signal priority or grade separation at intersections:
Year system commenced:
2013
[Opened 25 June]
Peak throughput (passengers/hr/direction):
1,150
[28-Oct-2013, North of Songmeiqiao station, AM peak, north-south]
City centre peak hour speed:
15 km/hr
[28-Oct-2013,average of AM & PM peak]
Peak city centre buses/hr/direction:
15
[28-Oct-2013, AM peak, N-S, north of Songmeiqiao station]
Total length of dedicated busway:
11.5 km
[Not really dedicated; shared with regular buses]
Length including mixed traffic portions:
19 km
Location of busway lanes:
Not effectively segregated
Number of BRT terminals:
1
[Shaoxing Beizhan]
Operation and Service:
Network of routes and corridors:
High peak period operational speed (>20km/hr):
Most bus passengers in BRT corridors carried by BRT buses:
Net time saving for bus passengers in corridor:
Throughput >10,000 passengers/hr (one direction):
Throughput >20,000 passengers/hr (one direction):
Carries more than a mixed traffic lane (3000 pphpd):
Buses operating both in & out of BRT corridors:
Competitively bid operating contracts:
More than one BRT bus operator:
No operational subsidy from government:
[subsidy needed]
Independently operated fare collection system:
System control centre:
BRT system coverage (2-way roads) (1 fare):
19 km
Number of corridors:
1
Routes operating both inside & outside BRT roads:
0
Routes operating only in busway corridors:
1
Median cash fare:
2.5 yuan
[distance-based range, from 1-4 yuan]
Median smart card fare:
2 yuan
[distance-based, range from 0.8-3.2 yuan]
BRT bus operator(s):
Shaoxing Public Transport Co.
BRT management agency:
Shaoxing Public Transport Co.
Operational mode:
trunk-only
Average bus occupancy (peak hour, direction & point):
68
Fare type (flat fare or distance-based):
distance-based
[1-4 yuan]
Stations:
Sliding doors in BRT stations:
Station size based on passenger demand:
Full weather protection on most station platforms:
Full weather protection on all station platforms:
>1 substop at >75% of stations (requires overtaking):
>1 stop position at stopping area at >75% of stations:
Real-time CCTV surveillance at all stations:
Number of BRT stations:
12
Average distance between stations:
1,580m
Location of bus doorways:
Right side
[traffic is on the right]
Station platform height:
35cm
Longest BRT station (non terminal):
30m
Shortest BRT station:
30m
Most station substops:
1
Number of turnstiles/gates per entry (median):
4
[2 entry, 2 exit]
+
-
©
OpenStreetMap
contributors
DOWNLOAD NETWORK
BRT PHOTOS
Infrastructure:
Enhanced station (more than just a bus shelter):
Overtaking lanes at more than 75% of stations:
Automated fare collection and fare verification:
Stations away from intersections:
Stations with functioning passing lanes:
0
Number of BRT depots:
1
Fare system vendor:
Zhejiang Public Information Industry Co.
Sliding door system vendor:
Jiangsu Huimin
Surveillance system vendor:
Zhejiang Public Information Industry Co.
Communications:
Distinctive BRT buses:
Real-time next bus information displays:
Distinctive marketing identity for system:
High-quality passenger information at stations:
High-quality passenger information on buses:
Audio announcements on BRT buses:
Distinctive BRT stations:
Access and Integration:
Bicycle parking at BRT stations:
Segregated bike lanes along main corridor(s):
Wheelchair accessible stations:
Bike sharing in vicinity of BRT stations:
Fleet of integrated BRT feeder buses:
0
BRT Vehicle:
High capacity BRT buses:
Fleet of special BRT buses:
36
Number of doors in BRT buses:
3
BRT vehicle length:
14m
No. of seats in 12m BRT buses:
40
[14m bus, includes 3 folding seats]
BRT vehicle fuel:
LNG
BRT bus manufacturer:
Kinglong
[Kinglong is based in Xiamen]
Others:
Buses paid for by operators rather than government:
No
Yes
Partial
Who We Are
ITDP-CHINA
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
Other Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us