Introduction
Guangzhou delegations
Yichang delegations
Contact Us
BRT Database
>
Cities List
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Bunous Aires
Cali
Cape Town
Changde
Changzhou
Chengdu
Curitiba
Dalian
Fuzhou
Guangzhou
Guayaquil
Guiyang
Hangzhou
Hefei
Islamabad
Istanbul
Jakarta
Jinan
Johannesburg
Kuala Lumpur
Lanzhou
Leon
Lianyungang
Lima
Los Angeles
Mexico City
Nagoya
Nanning
Nantes
Paris
Pune
Quito
Seoul
Shaoxing
Urumqi
Utrecht
Wenzhou
Wuhan
Xiamen
Yancheng
Yichang
Yinchuan
Yongzhou
Zaozhuang
Zhengzhou
Zhongshan
Zhoushan
>
Ahmedabad
:
[Updated Time(
2012-09-15
)]
BRT Basics:
Segregated busways or bus-only roadways:
[Segregation continues at flyovers, which are split]
Pre-board fare collection and fare verification:
Level boarding and alighting:
Signal priority or grade separation at intersections:
Year system commenced:
2009
[Testing in July (no fare). Full operation 15-Oct-09 first 12km. 27km opened in 2010]
Peak throughput (passengers/hr/direction):
1,200
[7-Sep-12,Juna Vadaj BRT station, PM peak]
Peak city centre buses/hr/direction:
20
Total length of dedicated busway:
38 km
Length including mixed traffic portions:
39 km
Location of busway lanes:
Centre of roadway
Number of BRT terminals:
0
[2 under construction]
System name:
Janmarg
Operation and Service:
Network of routes and corridors:
High peak period operational speed (>20km/hr):
Most bus passengers in BRT corridors carried by BRT buses:
Net time saving for bus passengers in corridor:
Throughput >10,000 passengers/hr (one direction):
Throughput >20,000 passengers/hr (one direction):
Carries more than a mixed traffic lane (3000 pphpd):
Buses operating both in & out of BRT corridors:
[Though buses have doors in both sides, permitting off-corridor operation]
Competitively bid operating contracts:
[Bus contracting based on km operated. Bus operator no role or share in fare collection.]
More than one BRT bus operator:
No operational subsidy from government:
[subsidy needed]
Oversight from an independent entity/agency:
[Company set up by city government to oversee operations]
System control centre:
[For fleet management as well as fare collection and revenue management]
BRT authority plans and controls the system:
BRT system coverage (2-way roads) (1 fare):
39 km
Number of corridors:
4
Routes operating both inside & outside BRT roads:
0
Routes operating only in busway corridors:
4
System passenger-trips per day:
115,000
[Source: ITDP, June-2011]
Median cash fare:
Rs 2-11
[Distanced-based fare, Rs 2-11 (0.3-1.6 yuan)]
Median smart card fare:
Rs 2-11
[Yet to start, planned same as cash fare]
BRT management agency:
Ahmedabad Janmarg Limited
Operational mode:
trunk-only
Average bus occupancy (peak hour, direction & point):
60
Fare type (flat fare or distance-based):
distance-based
Operating hours:
6:00am-11:30pm
Fleet of regular buses using BRT stations:
0
Stations:
Sliding doors in BRT stations:
Station size based on passenger demand:
Full weather protection on most station platforms:
Full weather protection on all station platforms:
Covered station access:
>1 substop at >75% of stations (requires overtaking):
>1 stop position at stopping area at >75% of stations:
Number of BRT stations:
76
[Stations updated to Aug-2013; other data Sep-2012]
Average distance between stations:
700m
Location of bus doorways:
Both sides
[traffic is on the left]
Station platform height:
90cm
Longest BRT station (non terminal):
35m
Shortest BRT station:
13m
Most station substops:
1
DOWNLOAD NETWORK
BRT PHOTOS
Infrastructure:
Enhanced station (more than just a bus shelter):
Overtaking lanes at more than 75% of stations:
Includes BRT-only tunnels or bridges:
[Flyovers were split to accommodate central BRT]
Low-emission vehicle technology (≥Euro III):
[Euro III diesel buses]
Automated fare collection and fare verification:
[Currently paper-based]
Physical BRT laneway dividers:
Stations with functioning passing lanes:
0
Number of BRT depots:
0
[1 under construction]
Communications:
Distinctive BRT buses:
Real-time next bus information displays:
Distinctive marketing identity for system:
[Janmarg]
High-quality passenger information at stations:
Audio announcements at stations:
High-quality passenger information on buses:
Audio announcements on BRT buses:
Distinctive BRT stations:
Access and Integration:
Bicycle parking at BRT stations:
Segregated bike lanes along main corridor(s):
[Yes, but bike lanes are discontinuous and not used]
Wheelchair accessible stations:
[In planning yes, but bollards prevent access]
Improvements to nearby public space:
Bike sharing in vicinity of BRT stations:
Fleet of integrated BRT feeder buses:
0
BRT Vehicle:
High capacity BRT buses:
[Special 12m, 90 person BRT buses]
Fleet of special BRT buses:
70
Number of doors in BRT buses:
1
[one in both sides of the buses, 1.96m wide]
BRT vehicle length:
12m
No. of seats in 12m BRT buses:
35
BRT vehicle fuel:
diesel, CNG
BRT bus manufacturer:
Tata
Lead local design / planning work:
CEPT University
Lead international design / planning work:
ITDP
Project website:
Janmarg
Fleet of 18m or larger BRT buses:
0
Others:
Buses paid for by operators rather than government:
Preliminary planning and design costs:
US$0.7 million
[$0.7 million, first 12.5km only]
Infrastructure cost per km:
US$2.4 million
[2009 value. US$2.4m, first 12.5km only]
Major prizes:
2010 Sustainable Transport Award
BRT Standard score (GOLD, SILVER, BRONZE):
BRONZE
[Narol-Noroda corridor Silver, RTO and Sola Bronze]
No
Yes
Partial
Who We Are
ITDP-CHINA
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
Other Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us