Introduction
Guangzhou delegations
Yichang delegations
Contact Us
BRT Database
>
Cities List
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Bunous Aires
Cali
Cape Town
Changde
Changzhou
Chengdu
Curitiba
Dalian
Fuzhou
Guangzhou
Guayaquil
Guiyang
Hangzhou
Hefei
Islamabad
Istanbul
Jakarta
Jinan
Johannesburg
Kuala Lumpur
Lanzhou
Leon
Lianyungang
Lima
Los Angeles
Mexico City
Nagoya
Nanning
Nantes
Paris
Pune
Quito
Seoul
Shaoxing
Urumqi
Utrecht
Wenzhou
Wuhan
Xiamen
Yancheng
Yichang
Yinchuan
Yongzhou
Zaozhuang
Zhengzhou
Zhongshan
Zhoushan
>
Nanning
:
[Updated Time(
2023-10-17
)]
BRT Basics:
Segregated busways or bus-only roadways:
Pre-board fare collection and fare verification:
Signal priority or grade separation at intersections:
Level boarding and alighting:
Peak throughput (passengers/hr/direction):
1147
[6-Jun-17,East of Minzhuxinminlukou Station , AM peak, east-west]
Peak city centre buses/hr/direction:
51
[6-Jun-17,East of Minzhuxinminlukou Station , AM peak, east-west]
Year system commenced:
2017
[Corridor 1 opened 25 January 2017, corridor 2 opened 26 Nov. 2018.]
System name:
NBRT
City centre peak hour speed:
15.37 km/hr
[6-Jun-17, PM peak hour , east-west; 15.81km/hr, west-east]
Location of busway lanes:
Median/curbside/mixed
Total length of dedicated busway:
28.5 km
[11.3 km corridor 1; 17.2 km corridor 2]
Length including mixed traffic portions:
13 km
Number of BRT terminals:
1 for B1
[used for 20 12-meter buses and 10 18-meter buses of B01]
Operation and Service:
Network of routes and corridors:
High peak period operational speed (>20km/hr):
Buses operating both in & out of BRT corridors:
Most bus passengers in BRT corridors carried by BRT buses:
Net time saving for bus passengers in corridor:
More than one BRT bus operator:
Throughput >20,000 passengers/hr (one direction):
Throughput >10,000 passengers/hr (one direction):
Carries more than a mixed traffic lane (3000 pphpd):
Competitively bid operating contracts:
Payment per bus-kilometre rather than per passenger:
No operational subsidy from government:
[operator paid at first, and then got back the money according to the PPP contract.]
Independently operated fare collection system:
BRT authority plans and controls the system:
System control centre:
BRT authority plans and controls the system:
Independently operated fare collection system:
BRT authority plans and controls the system:
BRT system coverage (2-way roads) (1 fare):
28.5 km
[11.3 km corridor 1; 17.2 km corridor 2]
Operational mode:
direct-service
Routes operating both inside & outside BRT roads:
28
[all along corridor 1,only B02 along corridor 2]
Routes operating only in busway corridors:
2
[B01, B02]
System passenger-trips per day:
138,000
Fare type (flat fare or distance-based):
flat fare
Median cash fare:
2 RMB
Median smart card fare:
1.8 RMB
Fleet of regular buses using BRT stations:
0
Average bus occupancy (peak hour, direction & point):
23
[6-Jun-2017,East of Mingzuxinminlukou Station , AM peak, E-W]
Number of corridors:
2
Type of fare collection / verification technology:
Card, cash, QR code
BRT bus operator(s):
Nanning Baima BRT Co. Ltd
Operating hours:
6:00am-23:00pm
Stations:
>1 substop at >75% of stations (requires overtaking):
>1 stop position at stopping area at >75% of stations:
Sliding doors in BRT stations:
Station size based on passenger demand:
Full weather protection on most station platforms:
Full weather protection on all station platforms:
Covered station access:
Escalators/lifts at >20% of stations with bridges/tunnels:
Real-time CCTV surveillance at all stations:
Number of BRT stations:
31
[17 stations along corridor 1, 14 stations along corridor 2]
Most station substops:
1
Longest BRT station (non terminal):
200 m
Shortest BRT station:
90 m
Station platform width (including walls & doors):
5 m(B1-B11)/4 m(B12-B16)
Station platform height:
35 cm
Average distance between stations:
920 m
[650 m for corridor 1; 1230 m for corridor 2]
Location of bus doorways:
Both sides
DOWNLOAD NETWORK
BRT PHOTOS
Infrastructure:
Enhanced station (more than just a bus shelter):
Overtaking lanes at more than 75% of stations:
Includes BRT-only tunnels or bridges:
Stations away from intersections:
[5 station are just at intersection]
Low-emission vehicle technology (≥Euro III):
Automated fare collection and fare verification:
Stations with functioning passing lanes:
100%
Fare system vendor:
Qingdao Hisense
Sliding door system vendor:
Sino Talent
Surveillance system vendor:
Zhejiang Dahua
Communications:
Real-time next bus information displays:
Distinctive BRT buses:
Distinctive marketing identity for system:
Distinctive BRT stations:
High-quality passenger information on buses:
High-quality passenger information at stations:
Audio announcements on BRT buses:
Access and Integration:
Bike sharing in vicinity of BRT stations:
Wheelchair accessible stations:
Bicycle parking at BRT stations:
Segregated bike lanes along main corridor(s):
Improvements to nearby public space:
BRT Vehicle:
Fleet of special BRT buses:
40
[10 for B01, 30 for B02]
Number of doors in BRT buses:
3 for 12 m bus, 6 for 18 m bus
BRT vehicle length:
12 m, 18 m
No. of seats in 12m BRT buses:
22 for 12 m bus, 37 for 18 m bus
BRT vehicle fuel:
LNG, hybrid,electric
BRT bus manufacturer:
ANKAI,SUNLONG,GOLDEN DRAGON, SUNWIN
Lead local design / planning work:
Guangxi urban and rural planning and Design Institute ,Guangzhou municipal engineering design and Research Institute
Lead international design / planning work:
ITDP
Others:
BRT Standard score (GOLD, SILVER, BRONZE):
BRONZE
Preliminary planning and design costs:
930 million yuan
No
Yes
Partial
Who We Are
ITDP-CHINA
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
Other Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us