Introduction
Guangzhou delegations
Yichang delegations
Contact Us
BRT Database
>
Cities List
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Bunous Aires
Cali
Cape Town
Changde
Changzhou
Chengdu
Curitiba
Dalian
Fuzhou
Guangzhou
Guayaquil
Guiyang
Hangzhou
Hefei
Islamabad
Istanbul
Jakarta
Jinan
Johannesburg
Kuala Lumpur
Lanzhou
Leon
Lianyungang
Lima
Los Angeles
Mexico City
Nagoya
Nanning
Nantes
Paris
Pune
Quito
Seoul
Shaoxing
Urumqi
Utrecht
Wenzhou
Wuhan
Xiamen
Yancheng
Yichang
Yinchuan
Yongzhou
Zaozhuang
Zhengzhou
Zhongshan
Zhoushan
>
Lanzhou
:
[Updated Time(
2020-02-20
)]
BRT Basics:
Segregated busways or bus-only roadways:
Pre-board fare collection and fare verification:
Level boarding and alighting:
Signal priority or grade separation at intersections:
Year system commenced:
2013
[Opened 28 Dec 2012 (limited routes); Jan 2013 full operation;28th Nov 2019 phase 2 opened.]
Peak throughput (passengers/hr/direction):
6,630
[29-May-2015 [19-Oct-15 similar],West of Xingfuxiang, PM peak,east-west]
5665(2019年7月22日,幸福巷站,晚高峰,东-西); 3935(2019年7月24日,幸福巷站,早高峰,西-东); 2730(2019年7月22日,兰州四中站,晚高峰,东-西); 2405(2019年7月22日,兰州四中站,晚高峰,西-东)
City centre peak hour speed:
22 km/hr
[Feb-2013, 29-May-2015, and 19-Oct-2015]
19.3km/h(2019年7月25日)
Peak city centre buses/hr/direction:
90
[19-Oct-2015, Xingfuxiang, PM peak, east-west]
Total length of dedicated busway:
12.3 km
[9.1 km phase 1, 3.2 km phase 2]
Length including mixed traffic portions:
12.3 km
[9.1 km phase 1, 3.2 km phase 2]
Location of busway lanes:
Centre of roadway
Operation and Service:
High peak period operational speed (>20km/hr):
Most bus passengers in BRT corridors carried by BRT buses:
Net time saving for bus passengers in corridor:
Throughput >10,000 passengers/hr (one direction):
Throughput >20,000 passengers/hr (one direction):
Carries more than a mixed traffic lane (3000 pphpd):
Payment per bus-kilometre rather than per passenger:
Competitively bid operating contracts:
More than one BRT bus operator:
No operational subsidy from government:
[no subsidy]
Independently operated fare collection system:
Oversight from an independent entity/agency:
System control centre:
BRT authority plans and controls the system:
Number of corridors:
1
Routes operating both inside & outside BRT roads:
6
[15, 59, 72, 118, 121, 131]
Routes operating only in busway corridors:
2
[B1, B2]
System passenger-trips per day:
309,000
[Avg daily ridership 11-15 May 2015. Doesn't include transfers]
Median cash fare:
1 yuan
Median smart card fare:
0.85 yuan
[Further discounts for elderly & students]
BRT bus operator(s):
Lanzhou No. 3 Bus Company
[Lanzhou No. 3 Bus Company is a subsidiary of Lanzhou Transport Group.]
Average bus occupancy (peak hour, direction & point):
75
Fare type (flat fare or distance-based):
flat fare
Stations:
Sliding doors in BRT stations:
Station size based on passenger demand:
Full weather protection on most station platforms:
Full weather protection on all station platforms:
Covered station access:
[Many but not all station accesses covered]
Escalators/lifts at >20% of stations with bridges/tunnels:
>1 substop at >75% of stations (requires overtaking):
>1 stop position at stopping area at >75% of stations:
[Generally yes, but not at all stations]
Real-time CCTV surveillance at all stations:
Number of BRT stations:
19
[15 stations phase 1, 4 stations phase 2]
Average distance between stations:
650m
Location of bus doorways:
Both sides
[traffic is on the right]
Station platform height:
35cm
Most station substops:
2
[Xi Zhan & Peili Guangchang designed 3, but operated 2]
Station platform width (including walls & doors):
4m
DOWNLOAD NETWORK
BRT PHOTOS
Infrastructure:
Enhanced station (more than just a bus shelter):
Overtaking lanes at more than 75% of stations:
Includes BRT-only tunnels or bridges:
Low-emission vehicle technology (≥Euro III):
Automated fare collection and fare verification:
Stations away from intersections:
Physical BRT laneway dividers:
Stations with functioning passing lanes:
100%
Number of BRT depots:
1
Fare system vendor:
Jiangsu Huimin
Sliding door system vendor:
Jiangsu Huimin
Surveillance system vendor:
Qingdao Hisense
Communications:
Distinctive BRT buses:
Real-time next bus information displays:
Distinctive marketing identity for system:
Audio announcements on BRT buses:
Distinctive BRT stations:
Access and Integration:
Segregated bike lanes along main corridor(s):
Wheelchair accessible stations:
Bike sharing in vicinity of BRT stations:
BRT Vehicle:
High capacity BRT buses:
Fleet of special BRT buses:
70
[50 12m and 20 18m]
Number of doors in BRT buses:
4
[2 in both sides of 12m buses]
BRT vehicle length:
12m, 18m
No. of seats in 12m BRT buses:
30
No. of seats in 18m BRT buses:
42
BRT vehicle fuel:
CNG
BRT bus manufacturer:
Youngman
Lead local design / planning work:
Guangzhou Municipal Engineering Design Research Institute
Lead international design / planning work:
ITDP-China
Fleet of 18m or larger BRT buses:
20
Others:
Buses paid for by operators rather than government:
Infrastructure cost per km:
595m yuan for 12.3km
[2012 value]
Major prizes:
2013 STA Award runner-up; UNFCC CDM project Oct. 2012; finalist HKIA Cross-Strait Architectural Design Awards 2015
BRT Standard score (GOLD, SILVER, BRONZE):
SILVER
Infrastructure financing source:
ADB 52.84%, city 25.04%, Bank of Lanzhou 22.12%
No
Yes
Partial
Who We Are
ITDP-CHINA
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
Other Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us