Institute for Transportation and Development Policy
Promoting sustainable and equitable transportation worldwide
中文
Photo
Article
Who We Are
ITDP China
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
0ther Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us
BRT Database
>
Cities List
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Bunous Aires
Cali
Cape Town
Changde
Changzhou
Chengdu
Curitiba
Dalian
Fuzhou
Guangzhou
Guayaquil
Guiyang
Hangzhou
Hefei
Islamabad
Istanbul
Jakarta
Jinan
Johannesburg
Kuala Lumpur
Lanzhou
Leon
Lianyungang
Lima
Los Angeles
Mexico City
Nagoya
Nanning
Nantes
Paris
Pune
Quito
Seoul
Shaoxing
Urumqi
Utrecht
Wenzhou
Wuhan
Xiamen
Yancheng
Yichang
Yinchuan
Yongzhou
Zaozhuang
Zhengzhou
Zhongshan
Zhoushan
>
Zaozhuang
:
[Updated Time(
2014-03-25
)]
BRT Basics:
Segregated busways or bus-only roadways:
[B1 Aug 2010, T1 July 2011, B2 Aug 2011, T2 Sep 2012, B3 and B4 Oct 2012, B10 May 2013, B5 Jan 2014]
Pre-board fare collection and fare verification:
[43 with pre-board fare collection, 13 without]
Level boarding and alighting:
[level but sometimes large gap]
Signal priority or grade separation at intersections:
Year system commenced:
2010
[Opened 1 August (charged from 1 Sept)]
Peak throughput (passengers/hr/direction):
1,400
[4-Mar-2014, East of Guishan park, AM peak, west-east]
City centre peak hour speed:
28 km/hr
[4-Mar-2014, Keyunhuancheng Zhongxin to Dongshen Lu, Peak hour; 39km/h in full corridor]
Peak city centre buses/hr/direction:
23
[4-Mar-2014, Guishan park, AM peak, west-east]
Total length of dedicated busway:
65 km
[Curbside lanes 68km]
Length including mixed traffic portions:
133 km
Location of busway lanes:
Centre of roadway; kerbside
Number of BRT terminals:
6
[West rail stn, High speed rail stn, Shanting coach terminal, Yicheng coach terminal, Passenger transfer centre, Taierzhuang terminal]
System name:
Zaozhuang BRT
Operation and Service:
Network of routes and corridors:
High peak period operational speed (>20km/hr):
Most bus passengers in BRT corridors carried by BRT buses:
Net time saving for bus passengers in corridor:
Throughput >10,000 passengers/hr (one direction):
Throughput >20,000 passengers/hr (one direction):
Carries more than a mixed traffic lane (3000 pphpd):
Payment per bus-kilometre rather than per passenger:
Buses operating both in & out of BRT corridors:
Competitively bid operating contracts:
More than one BRT bus operator:
No operational subsidy from government:
[subsidy needed]
System control centre:
BRT system coverage (2-way roads) (1 fare):
148.5 km
[https://www.toutiao.com/a6477336312843076109/]
Number of corridors:
6
Routes operating both inside & outside BRT roads:
8
Routes operating only in busway corridors:
8
[B1, B2, B3, B4, B5, B10, T1, T2]
Median cash fare:
2 yuan
[B2: 3rmb; B10: distance-based, 5rmb whole line]
Median smart card fare:
1.8 yuan
[1 yuan for students]
BRT bus operator(s):
B1, B3, B4, B5, B10, T1, T2: Zaozhuang Urban Public Transport Co. B2: Zaozhuang Tongcheng BRT Co.
BRT management agency:
Zaozhuang Transport Bureau
[Both companies are under the Zaozhuang Transport Bureau]
Operational mode:
trunk-feeder
Average bus occupancy (peak hour, direction & point):
56
Fare type (flat fare or distance-based):
flat fare
[except for route B10]
Stations:
Sliding doors in BRT stations:
[43 with sliding doors, 13 without]
Station size based on passenger demand:
Full weather protection on most station platforms:
Full weather protection on all station platforms:
Covered station access:
>1 substop at >75% of stations (requires overtaking):
>1 stop position at stopping area at >75% of stations:
Number of BRT stations:
56
[43 with pre-board fare collection, 13 without]
Average distance between stations:
1,635m
Location of bus doorways:
Right side
[traffic is on the right]
Station platform height:
35cm
Longest BRT station (non terminal):
70m
Shortest BRT station:
28m
Most station substops:
1
Number of turnstiles/gates per entry (median):
4
[2 entry, 2 exit]
Station platform width (including walls & doors):
4m
DOWNLOAD NETWORK
BRT PHOTOS
Infrastructure:
Enhanced station (more than just a bus shelter):
Overtaking lanes at more than 75% of stations:
Includes BRT-only tunnels or bridges:
Low-emission vehicle technology (≥Euro III):
[Buses yes, but fuel?]
Stations away from intersections:
Stations with functioning passing lanes:
0
Number of BRT depots:
1
Fare system vendor:
Jiangsu Huimin
Sliding door system vendor:
Jiangsu Huimin
Surveillance system vendor:
Qingdao Hisense
Communications:
Distinctive BRT buses:
Real-time next bus information displays:
Distinctive marketing identity for system:
[Zaozhuang BRT]
High-quality passenger information at stations:
High-quality passenger information on buses:
Access and Integration:
Bicycle parking at BRT stations:
Segregated bike lanes along main corridor(s):
[Mostly]
Wheelchair accessible stations:
Bike sharing in vicinity of BRT stations:
BRT Vehicle:
High capacity BRT buses:
Fleet of special BRT buses:
177
[https://www.toutiao.com/a6477336312843076109/]
Number of doors in BRT buses:
2
[3 in the 18m buses]
BRT vehicle length:
12m, 18m
No. of seats in 12m BRT buses:
37
[36 for Zhongtong, 37 for Kinglong]
No. of seats in 18m BRT buses:
51
[all Kinglong]
BRT vehicle fuel:
diesel
BRT bus manufacturer:
Kinglong and Zhongtong
[the 18m buses are Kinglong]
Project website:
zzbus.com
Fleet of 18m or larger BRT buses:
7
Others:
Buses paid for by operators rather than government:
BRT Standard score (GOLD, SILVER, BRONZE):
Basic BRT
[Corridor 1 is Bronze, others Basic BRT or non-BRT]
No
Yes
Partial
Who We Are
ITDP-CHINA
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
Other Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us